Seminal
The magazine and atlas of EU-funded researchA new publication from the web and AI team at Scott Charnley

Atlas / Denmark

Innovation Action · Running

ASPIRE Additive manufacturing for Scalable battery Pack Industrial Right-first-time manufacturing in Europe

Coordinator
AIRY Automotive ApS, Denmark
Runs
1 June 2026 to 31 May 2029
Status
Running
EU funding
€6.7m
Total cost
€8.8m
Partners
9 organisations in 5 countries
Type
Innovation Action
Grant agreement
101295162

What the project is doing

In the project's own words, from its summary on CORDIS.

Europe’s net-zero manufacturing base produced ~€80bn in revenue in 2023 and supports ~600k factory jobs; NZIA targets EU capacity that meets a large share of demand by 2030. The ASPIRE project addresses Annex I “Batteries & Energy Storage” by advancing large-scale additive manufacturing for EV battery packs (BP) while strengthening the EU’s clean technology value chains. Building on partner AIRY’s FIBER DRIVE technology, the project achieves TRL 7 through the demonstration of full-scale, lightweight, scalable battery packs manufactured in continuous-fibre thermoplastic composites.

ASPIRE reduces structural mass by 50% and cuts cost by 40%, while integrated digital twins, predictive 3D fibre-matrix models, inline quality control, and scalable component libraries enable first-time-right production and rapid reconfigurability across multiple OEM platforms. By reducing part complexity by 60% and embedding design-for-disassembly principles, ASPIRE improves repairability and reuse, where end-of-life materials will be valorised into new feedstocks, closing the loop on thermoplastic composites.

This directly addresses NZI targets on strategic autonomy and circularity. Printed packs validated by Volvo (trucks) and Stellantis (light-duty vehicles), a 3-level testing campaign, a blueprint for semi-automated pilot lines, and a robust LCA/LCC evidence will result in measurable, industry-relevant outputs. The project results are estimated to lead to reductions in CO2 of >1.333 billion kg at scale, in CAPEX of >30%, and design to production from 2 years to just 3 months.

The ASPIRE process and outputs demonstrate a replicable route to EU manufacturing capacity growth across NZIA technologies.

Topics

Who is involved

OrganisationCityCountryRole
AIRY Automotive ApSGreveDenmarkCoordinator
Danmarks Tekniske UniversitetKongens LyngbyDenmarkParticipant
Northmoore ApsKongens LyngbyDenmarkParticipant
Lft & Udtapes Sociedad LimitadaPaternaSpainParticipant
Commissariat a L Energie Atomique Et Aux Energies AlternativesParisFranceParticipant
OPmobility e-Power FranceLyonFranceParticipant
Stellantis Auto SASPoissyFranceParticipant
Avl Italia SpATorinoItalyParticipant
Volvo Technology ABGoteborgSwedenParticipant

Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI