- Coordinator
- Fundacion Cener, Spain
- Runs
- 1 October 2023 to 30 September 2027
- Status
- Running
- EU funding
- €5.3m
- Total cost
- €5.9m
- Partners
- 17 organisations in 10 countries
- Type
- Innovation Action
- Grant agreement
- 101122231
What the project is doing
In the project's own words, from its summary on CORDIS.
Highly efficient energy conversion of solar power and storage will play a vital role in a future sustainable energy system. Thus, this project focuses on the development of a novel high-efficiency solar thermal power plant concept with an integrated electricity storage solution. The project combines air-based central receiver Concentrated Solar Power (CSP) and Compressed Air Energy Storage (CAES) to maximize conversion efficiency and power grid energy management, enabling a new operation strategy and business models.
The hybrid concept initiates a futuristic era with adaptive renewable power plants, producing both electrical and thermal energy, including process heat supply and reverse osmosis desalination. Because cheap off-peak electricity is used to provide the air compression work of the topping Brayton cycle, the overall peak solar-to-electric energy conversion efficiency of the proposed power plant may reach up to 40% efficiency, which roughly doubles the peak efficiency with respect to state-of-the-art CSP technology.
The project’s activity will cover the techno-economic-environmental optimisation of the innovative CSP-CAES plant using representative boundary conditions, provided by grid operators and specialised partners, as well as the development and extensive testing of key components needed for its implementation. The main development will cover: (i) an advanced high-efficiency solar receiver, (ii) optical sensors and AI-based control, (iii) optimized CAES with heat exchangers and compressor/expander detailed designs and (iv) innovative integration of desalination.
The proposed technology is set forth by an interdisciplinary partnership spanning the entire CSP value chain. Targeting a TRL of 6-7, the ASTERIx-CAESar concept will be validated with a demonstration scale of 480 kWth prototype in a relevant environment.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Fundacion Cener | Sarriguren | Spain | Coordinator |
| Clancy Haussler Rita | Trins | Austria | Participant |
| Energy and Turbomachinery Network | Bruxelles | Belgium | Participant |
| Softinway Switzerland Llc | Zug | Switzerland | Associatedpartner |
| Doosan Skoda Power Sro | Plzen | Czechia | Participant |
| Engionic Femto Gratings GmbH | Goslar | Germany | Participant |
| Fraunhofer Gesellschaft Zur Forderung Der Angewandten Forschung eV | Munchen | Germany | Participant |
| Pritzkow Walter Erich Christian | Stuttgart | Germany | Participant |
| Aalborg Csp AS | Aalborg | Denmark | Participant |
| Diacheiristis Ellinikou Diktyou Dianomis Elektrikis Energeias Ae | Athina | Greece | Participant |
| Apria Systems SL | Astillero (El) | Spain | Participant |
| Centro De Investigaciones Energeticas Medioambientales Y Tecnologicas | Madrid | Spain | Participant |
| Fundacion IMDEA Energia | Mostoles Madrid | Spain | Participant |
| Innovation Therm Technologies SL | Benalmadena | Spain | Participant |
| Universidad De Sevilla | Sevilla | Spain | Participant |
| Universita Degli Studi Roma Tre | Roma | Italy | Participant |
| Bluebox Energy Ltd | Gosport | United Kingdom | Associatedpartner |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI