- Coordinator
- Katholieke Universiteit Leuven, Belgium
- Runs
- 1 January 2024 to 31 December 2027
- Status
- Running
- EU funding
- €5.1m
- Total cost
- —
- Partners
- 13 organisations in 7 countries
- Type
- Research and Innovation Action
- Grant agreement
- 101137552
What the project is doing
In the project's own words, from its summary on CORDIS.
The EC’s Critical Raw Materials (CRM) Act sets multiple benchmarks for reducing Europe’s dependency on a few unlike-minded third countries for strategic/critical raw materials. Through the domestic extraction of two CRMs – “vanadium” (V) and “titanium metal” (Ti metal) – AVANTIS addresses the first target of the Act (> 10% domestic extraction, for V & Ti). AVANTIS’ rationale lies in the fact that Europe has a multitude of unexploited, low-grade V-bearing titanomagnetite deposits in Finland, Sweden, Greenland, Norway, Poland, Ukraine… However, these deposits have a complex “spiderweb-like” mineral assemblage.
Without selective blasting, selective fragmentation and pre-concentration technologies to separate the Ti-rich ilmenite grains from the V-bearing magnetite, it is uneconomic to exploit these deposits. Supported by a bespoke forensic geometallurgy approach, AVANTIS develops a novel selective blasting approach that allows for rock excavation in view of increased mineral liberation at the blasting stage, and reduced energy demand in the crushing & grinding stages.
Likewise, AVANTIS designs tailored, water-free and water-lean pre-concentration technologies that allow to produce two distinct pre-concentrates ((1) ilmenite-rich, Ti-pre-concentrate and (2) ilmenite-free, V-pre-concentrate). The water-lean method is also tailored to process V/Ti-bearing mining wastes from historical/on-going operations. The resulting flowsheets have a low net water consumption (> 70% water recycling) and reduced GHG intensity of extraction (reduction of 60–700 g CO2,eq per t ore hauled to the crushing plant).
A preliminary analysis of the potential European reserves that are unlocked, yields a total of 154 Mt Ti & 3.5 Mt V (still excluding Ukraine), to be compared with current levels of EU consumption (1.5 Mt/y Ti; 12.7 kt/y V). AVANTIS strengthens the “responsible mining in Europe”-paradigm, increasing society’s trust in domestic CRM production.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Katholieke Universiteit Leuven | Leuven | Belgium | Coordinator |
| Australian Titanium Pty Ltd | Perth | Australia | Associatedpartner |
| Polytechneio Kritis | Chania | Greece | Participant |
| Universidad Politecnica De Madrid | Madrid | Spain | Participant |
| Geologian Tutkimuskeskus | Espoo | Finland | Participant |
| Ima Engineering Ltd Oy | Espoo | Finland | Participant |
| Oulun Yliopisto | Oulu | Finland | Participant |
| Otanmäki Mine Oy | Oulu | Finland | Associatedpartner |
| Strategic Explorations Oy | Helsinki | Finland | Associatedpartner |
| Norges Teknisk-Naturvitenskapelige Universitet NTNU | Trondheim | Norway | Participant |
| Titania AS | Hauge I Dalane | Norway | Participant |
| Akademia Gorniczo-Hutnicza Im. Stanislawa Staszica W Krakowie | Krakow | Poland | Participant |
| Proxis Sp Zoo | Laziska Gorne | Poland | Participant |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI