Atlas / Belgium

Research and Innovation Action · Running

AVANTIS Sustainable, decarbonised vanadium, titanium and iron extraction from Europe’s low-grade vanadium-bearing titanomagnetite deposits

Coordinator
Katholieke Universiteit Leuven, Belgium
Runs
1 January 2024 to 31 December 2027
Status
Running
EU funding
€5.1m
Total cost
—
Partners
13 organisations in 7 countries
Type
Research and Innovation Action
Grant agreement
101137552

What the project is doing

In the project's own words, from its summary on CORDIS.

The EC’s Critical Raw Materials (CRM) Act sets multiple benchmarks for reducing Europe’s dependency on a few unlike-minded third countries for strategic/critical raw materials. Through the domestic extraction of two CRMs – “vanadium” (V) and “titanium metal” (Ti metal) – AVANTIS addresses the first target of the Act (> 10% domestic extraction, for V & Ti). AVANTIS’ rationale lies in the fact that Europe has a multitude of unexploited, low-grade V-bearing titanomagnetite deposits in Finland, Sweden, Greenland, Norway, Poland, Ukraine… However, these deposits have a complex “spiderweb-like” mineral assemblage.

Without selective blasting, selective fragmentation and pre-concentration technologies to separate the Ti-rich ilmenite grains from the V-bearing magnetite, it is uneconomic to exploit these deposits. Supported by a bespoke forensic geometallurgy approach, AVANTIS develops a novel selective blasting approach that allows for rock excavation in view of increased mineral liberation at the blasting stage, and reduced energy demand in the crushing & grinding stages.

Likewise, AVANTIS designs tailored, water-free and water-lean pre-concentration technologies that allow to produce two distinct pre-concentrates ((1) ilmenite-rich, Ti-pre-concentrate and (2) ilmenite-free, V-pre-concentrate). The water-lean method is also tailored to process V/Ti-bearing mining wastes from historical/on-going operations. The resulting flowsheets have a low net water consumption (> 70% water recycling) and reduced GHG intensity of extraction (reduction of 60–700 g CO2,eq per t ore hauled to the crushing plant).

A preliminary analysis of the potential European reserves that are unlocked, yields a total of 154 Mt Ti & 3.5 Mt V (still excluding Ukraine), to be compared with current levels of EU consumption (1.5 Mt/y Ti; 12.7 kt/y V). AVANTIS strengthens the “responsible mining in Europe”-paradigm, increasing society’s trust in domestic CRM production.

Topics

Who is involved

OrganisationCityCountryRole
Katholieke Universiteit LeuvenLeuvenBelgiumCoordinator
Australian Titanium Pty LtdPerthAustraliaAssociatedpartner
Polytechneio KritisChaniaGreeceParticipant
Universidad Politecnica De MadridMadridSpainParticipant
Geologian TutkimuskeskusEspooFinlandParticipant
Ima Engineering Ltd OyEspooFinlandParticipant
Oulun YliopistoOuluFinlandParticipant
Otanmäki Mine OyOuluFinlandAssociatedpartner
Strategic Explorations OyHelsinkiFinlandAssociatedpartner
Norges Teknisk-Naturvitenskapelige Universitet NTNUTrondheimNorwayParticipant
Titania ASHauge I DalaneNorwayParticipant
Akademia Gorniczo-Hutnicza Im. Stanislawa Staszica W KrakowieKrakowPolandParticipant
Proxis Sp ZooLaziska GornePolandParticipant

Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI