Seminal
The magazine and atlas of EU-funded researchA new publication from the web and AI team at Scott Charnley

Atlas / Spain

Innovation Action · Running

CARMA-H2 Carbon-negative pressurized hydrogen production from waste using an energy efficient protonic membrane reformer CARMA-H2

Coordinator
Asociacion De La Industria Navarra, Spain
Runs
1 October 2024 to 30 September 2028
Status
Running
EU funding
€10.0m
Total cost
€12.8m
Partners
13 organisations in 5 countries
Type
Innovation Action
Grant agreement
101137756

What the project is doing

In the project's own words, from its summary on CORDIS.

CARMA-H2 will enable highly attractive hydrogen production from biogas through demonstration of a protonic membrane reformer (bioPMR) that integrates steam methane reforming and water-gas shift reactions, hydrogen separation, heat management, CO2 capture and hydrogen compression in a single stage. The realization of 6 process steps in a single reactor allows to achieve unprecedented energy efficiency with a project target to demonstrate >85% (HHV) at the bioPMR level.

The bioPMR technology enables direct delivery of purified and pressurized H2 (30 bar). BioPMR will be coupled with CO2 liquefaction to enable direct production of food-grade CO2. Coupling the liquefaction unit allows for higher hydrogen recovery and liquid CO2 production as the off-gas from the liquefaction process will be recycled back to the bioPMR unit. CARMA-H2 will demonstrate the bioPMR technology integrated with CO2 liquefaction at the existing Arazuri wastewater treatment plant in the region of Navarra in Spain.

The demonstration plant will be operated for at least 4000 h, and produce 500 kg/day of hydrogen and above 4000 kg/day of food-grade CO2. To facilitate the demonstration CARMA-H2 will install 1) a pre-treatment system for biogas compression and removal of sulphur and other impurities, 2) two bioPMR modules which will operate directly on biogas (CO2 > 40 vol.%), and 3) an integrated CO2 liquefaction unit. The demonstration plant will be located in Ebro Valley Hydrogen Corridor, and the project aims to secure off-take of the produced hydrogen and liquid CO2 during operation.

The overall system will be controlled and analysed by an advanced control system and an associated digital twin that will be developed in the project. The wastewater plant is currently operating a biogas production plant of >4 MW from which the biogas is utilized for power generation. The achievements in CARMA-H2 will be an important proof of technological feasibility advancing the technology from TRL5 to TRL7.

Topics

Who is involved

OrganisationCityCountryRole
Asociacion De La Industria NavarraCordovillaSpainCoordinator
Union Engineering ASFredericiaDenmarkParticipant
Agencia Estatal Consejo Superior De Investigaciones CientificasMadridSpainParticipant
Hera Holding Habitat, Ecologia Y Restauracion Ambiental S.l.BarcelonaSpainParticipant
Navarra De Infraestructuras Locales Sociedad Anonima (nilsa)PamplonaSpainParticipant
Servicios De La Comarca De Pamplona SAPamplonaSpainParticipant
Tecnicas Reunidas SAMadridSpainParticipant
Fondazione IconsLodiItalyParticipant
Snam SpAMilanoItalyParticipant
Haffmans BVVenloNetherlandsParticipant
Shell Global Solutions International BV's-Gravenhage (Den Haag)NetherlandsParticipant
Coorstek Membrane Sciences ASOsloNorwayParticipant
Sintef ASTrondheimNorwayParticipant

Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI