- Coordinator
- Forum Des Laboratoires Nationaux Europeens De Recherche Routiere Fehrlaisbl, Belgium
- Runs
- 1 May 2023 to 30 April 2027
- Status
- Running
- EU funding
- €4.8m
- Total cost
- €5.7m
- Partners
- 20 organisations in 9 countries
- Type
- Innovation Action
- Grant agreement
- 101104283
What the project is doing
In the project's own words, from its summary on CORDIS.
The overall objective of CIRCUIT is to develop a holistic approach supported by digital solutions and guidelines to foster the introduction of innovative engineering practices in the whole construction supply/value chain to foster The overall objective of CIRCUIT is to develop a holistic approach supported by digital solutions and guidelines to foster the introduction of innovative engineering practices in the whole construction supply/value chain enabling circular, sustainable resilient and smart transport infrastructure and a wider deployment of Green Public and Innovation Procurement.
This will be achieved by:i.developing and deploying an innovative open-source digital platform (with advanced Circularity analytics and Supply/value chain matchmaking tools) interoperable with traditional engineering/design (BIM, Digital Twinm LCC, LCA) and traffic simulation tools; ii.introducing modular solutions, ecodesign and reusing concepts as alternative to traditional designs; iii.maximizing the use of biobased, Secondary Raw Materials (SRM) and Secondary Construction Elements (SCE) as alternative to traditional ones; iv.including in the decision making process of transport infrastructures design and route planning, information from updated traffic simulation tools to reduce incidents, accidents, congestion and future scenarios with autonomous vehicles).
New elements and technologies for Circular, Smart, Resilient and Sustainable transport will be included in the design process to facilitate infrastructures upgrading and a quick adaptation to smart mobility and operations. CIRCUIT will also provide knowledge and technical solutions by exploiting the potential of four strategic pillars: Digitalisation, Recycle, Reuse and Energy. Different technologies will be validated in each of the pillars to deliver a holistic approach suitable for different transport modes, the urban and interurban environment, and the different stages of the life cycle of infrastructures.
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Forum Des Laboratoires Nationaux Europeens De Recherche Routiere Fehrlaisbl | Bruxelles / Brussel | Belgium | Coordinator |
| European Union Road Federation Aisbl | Bruxelles / Brussel | Belgium | Participant |
| Ingevity Holdings SRL | Bruxelles / Brussel | Belgium | Participant |
| Digitaltwin Technology GmbH | Koln | Germany | Participant |
| Acciona Construccion Iberia SA | Madrid | Spain | Participant |
| Instituto Espanol Del Cemento Y Sus Aplicaciones | Madrid | Spain | Participant |
| Ministerio De Transportes Y Movilidad Sostenible | Madrid | Spain | Participant |
| Universidad De Cantabria | Santander | Spain | Participant |
| Right-Click | Paris | France | Participant |
| Beton - Lucko Doo Za Graditeljstvoproizvodnju Transport I Trgovinu | Zagreb | Croatia | Participant |
| Hrvatske Autoceste Drustvo S Ogranicenom Odgovornoscu, Za Upravljanje,gradenje I Odrzavanje Autocesta | Zagreb | Croatia | Participant |
| Infra Plan Konzaltnig Jdoo Za Usluge | Zagreb | Croatia | Participant |
| Sveuciliste U Zagrebu Gradevinski Fakultet | Zagreb | Croatia | Participant |
| Algorab SRL | Lavis Tn | Italy | Participant |
| Anas SpA | Roma | Italy | Participant |
| Ingeo BV | Delft | Netherlands | Participant |
| Waterschap Hollandse Delta | Ridderkerk | Netherlands | Participant |
| Obcina Crna Na Koroskem | Crna Na Koroskem | Slovenia | Participant |
| Zavod Za Gradbenistvo Slovenije | Ljubljana | Slovenia | Participant |
| Uberbinder Limited | Stockbridge | United Kingdom | Associatedpartner |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI