CITADEL Substitution of fossil Combustion in Industrial high-Temperature processes by ADvanced ELectrical heating technologies
- Coordinator
- Helmholtz-Zentrum Dresden-Rossendorf eV, Germany
- Runs
- 1 January 2024 to 31 December 2027
- Status
- Running
- EU funding
- €13.3m
- Total cost
- €18.3m
- Partners
- 15 organisations in 7 countries
- Type
- Innovation Action
- Grant agreement
- 101138794
What the project is doing
In the project's own words, from its summary on CORDIS.
Effectively combating global warming requires a significant reduction in CO2 emissions. This poses enormous challenges, especially for the energy-intensive process and production industry, as this industry accounts for one third of total energy consumption. What is needed is intelligent electrification across all operational processes. Electrification has such a large potential impact on decarbonisation because it allows clean, renewable electricity to power processes that previously used emissions-intensive technologies (such as gas burners).
This means that a process that previously produced high emissions can become absolutely emission-free when powered by renewable energy. The aim of the CITADEL project is to substitute fossil combustion processes with innovative electric technologies, such as electric resistance heating, microwave heating and plasma heating. Five use cases are considered, targeting the production of refractory bricks, glass and copper wires, preheating processes in steel production and the recycling of concrete.
For these specific applications, appropriate demonstration plants have to be designed, built, tested close to the process and validated. This is supported by corresponding activities to provide suitable high-temperature materials and tools for instrumentation and effective process control. Challenges regarding a stable energy supply, electrical and thermal load management or intelligent energy management are simulated by means of numerical models.
This includes corresponding risk assessments, e.g. with regard to possible time constraints in terms of a continuous power supply and the consequences of supply fluctuations for process safety. All demonstration cases will be evaluated by a life cycle analysis and with regard to the effectiveness in the reduction of greenhouse gases. The impact of the technical solutions developed here for the process industry will be assessed and strategies for scale-up and deployment will be elaborated.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Helmholtz-Zentrum Dresden-Rossendorf eV | Dresden | Germany | Coordinator |
| Asta Elektrodraht | Oed | Austria | Participant |
| Asta Industrie GmbH | Oed | Austria | Participant |
| Fricke Und Mallah Microwave Technology GmbH | Peine | Germany | Participant |
| Ceramica Del Nalon SA | Lada - Langreo | Spain | Participant |
| Idener Research & Development Aie | Sevilla | Spain | Participant |
| Sidenor Aceros Especiales SL | Basauri Bizkaia | Spain | Participant |
| Sidenor Investigacion Y Desarrollosa | Basauri | Spain | Participant |
| Politecnico Di Bari | Bari | Italy | Participant |
| C2ca Technology BV | Rotterdam | Netherlands | Participant |
| Technische Universiteit Delft | Delft | Netherlands | Participant |
| Entech Energiteknik AB | Angelholm | Sweden | Participant |
| Kungliga Tekniska Hoegskolan | Stockholm | Sweden | Participant |
| Institut Jozef Stefan | Ljubljana | Slovenia | Participant |
| Steklarna Hrastnik Druzba Za Proizvproizvodnjo Steklenih Izdelkov Doo | Hrastnik | Slovenia | Participant |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI