Seminal
The magazine and atlas of EU-funded researchA new publication from the web and AI team at Scott Charnley

Atlas / Greece

Research and Innovation Action · Running

GRAVITEQA GRAVITational StoragE, Quantum computing, and AI for enhanced Circularity and Reliability in Clean transition-affected sector-coupled electricity grids

Coordinator
Ethniko Kai Kapodistriako Panepistimio Athinon, Greece
Runs
1 January 2025 to 31 December 2027
Status
Running
EU funding
€2.5m
Total cost
€2.5m
Partners
11 organisations in 3 countries
Type
Research and Innovation Action
Grant agreement
101192566

What the project is doing

In the project's own words, from its summary on CORDIS.

The clean energy transition requires at least a 55% reduction in GHG emissions (from 1990 levels) by 2030, according to the ‘Fit for 55’ package. Thus, electricity grids will be called upon to operate in an overall context of 50% electricity production from RES of any scale by 2030. Thus, several challenges will become even more apparent in the following years: (i) reliability issues in electricity grids due to rapid decarbonization, (ii) lack of circularity in conventional power plant’s decommissioning process, (iii) operational issues in sector-coupled systems under mass electrification scenarios, (iv) significant computation and data processing efforts are required to manage the future grid.

GRAVITEQA highlights the synergetic benefits of gravitational storage, Quantum Computing (QC) and Quantum Inspired Computing (QIC), and data-driven, trustworthy AI-based analytics services. GRAVITEQA develops and validates 9 components/methodologies up to a TRL 4: (i) QC and QIC for the Facility Location Allocation and Load-side assets management problems, (ii) a generic and holistic methodology to find the optimal energy storage technology or mix of them, to transform a coal power plant and mine into a long duration energy storage plant, (iii) repurposing of available assets case study capable of providing long-term storage and enhancing recyclability of a under-decommissioning thermal power plant and an abandoned coal plant, (iv) conformal prediction for robust energy demand of cold ironing, (v) optimal charging of cold ironing and EVs respecting grid constraints for reliable green port operation, (vi) seaport electrification strategy for seaports: analysis and scenarios planning, (vii) fast nodal flexibility region estimation algorithm for 3-phase grids unlocking the flexibility services procurement from distributed RES, (viii) end-to-end trustworthy learning for non-convex optimization problems, and (ix) a reference design for edge inference in smart grid applications.

Topics

Who is involved

OrganisationCityCountryRole
Ethniko Kai Kapodistriako Panepistimio AthinonAthinaGreeceCoordinator
Electrodistribution Grid West AdSofiaBulgariaParticipant
Elektroenergien Sistemen Operator EadSofiaBulgariaParticipant
Software Company EoodSofiaBulgariaParticipant
Dimosia Epicheirisi Ilektrismou Anonymi EtaireiaAthinaGreeceParticipant
Future Energy Innovative Technologies I.k.e.MarousiGreeceParticipant
Panepistimio Dytikis MakedoniasKozaniGreeceParticipant
Fsas Technologies SLPozuelo De AlarconSpainParticipant
Fujitsu Technology Solutions, SAPozuelo De AlarconSpainParticipant
Fundacion CartifBoecilloSpainParticipant
Fundacion Publica Gallega Centro Tecnologico De Supercomputacion De GaliciaSantiago De CompostelaSpainParticipant

Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI