Seminal
The magazine and atlas of EU-funded researchA new publication from the web and AI team at Scott Charnley

Atlas / France

Research and Innovation Action · Running

HEATERNAL innovative High tEmperAture ThErmal stoRage for iNdustrial AppLications

Coordinator
Commissariat a L Energie Atomique Et Aux Energies Alternatives, France
Runs
1 May 2023 to 30 April 2027
Status
Running
EU funding
€3.5m
Total cost
€3.5m
Partners
11 organisations in 4 countries
Type
Research and Innovation Action
Grant agreement
101103921

What the project is doing

In the project's own words, from its summary on CORDIS.

Industrial processes in the EU released 351 Mtons CO2e in 2020, 8% less than in 2019. In many cases, continuous, high-temperature heat is needed for these processes, and no viable decarbonization solution exists today. Viable, short-term thermal energy storage (up-to 48-hours) would enable the replacement of fossil fuels by industrial waste-heat and renewable electricity. HEATERNAL unites 4 public research teams specialized in prototyping and modelling of thermal systems, phase-change materials and 3D-printing; 2 metals manufacturers; 2 ceramic manufacturers; 1 process engineering SME and equipment manufacturer; 1 SME specialized in LCA and technico-economic analysis; and 1 SME experienced in dissemination and communication.

They aim to prototype and model a new thermal energy storage concept combining strong scientific and industrial know-how: (i) innovative phase-change materials and unit designs allowing to increase the unit energy density by 350% versus ceramic bricks, and (ii) manufacturing experience ensuring that materials and units can be rapidly implemented in factories by 2030. Thus, the project will yield a 50kWh prototype (TRL5) and models of the upscaled storage system connected to factories.

The preliminary technico-economic study predicts a return on investment below 3 years and levelized cost of stored energy below 6€/MWh. This is 60% lower than molten salt storage, which doesn’t work at sufficiently high temperatures for most metals and minerals industries (steel, glass, cement, ceramics, etc.) HEATERNAL’s solution meets industrial needs, including low footprint, lifetime over 10 years and fast return on investment.

The exploitation plan aims to implement the solution in the first factory in 2030. Sales projections are estimated to reach 286M€ from sales of phase-change materials, ceramic refractories & engineering services by 2040, enabling 147.5 Mt CO2eq to be avoided by 2040 thanks to HEATERNAL thermal energy storage systems.

Topics

Who is involved

OrganisationCityCountryRole
Commissariat a L Energie Atomique Et Aux Energies AlternativesParisFranceCoordinator
Universiteit GentGentBelgiumParticipant
Acondicionamiento Tarrasense AssociacionTerrassaSpainParticipant
Alumina Espanola SAMadridSpainParticipant
Centro De Investigacion Cooperativa De Energias Alternativas Fundacion, Cic Energigune FundazioaMinano AlavaSpainParticipant
Lomartov SLBurjassotSpainParticipant
Torrecid SAAlcora CastellonSpainParticipant
Calderys France SASSezanneFranceParticipant
Delaunay Et FilsLe HavreFranceParticipant
UgitechUgineFranceParticipant
Sociedade Portuguesa De Inovacao Consultadoria Empresarial E Fomento Da Inovacao SAPortoPortugalParticipant

Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI