Seminal
The magazine and atlas of EU-funded researchA new publication from the web and AI team at Scott Charnley

Atlas / Belgium

Research and Innovation Action · Running

ICONIC Smart, Aware, Integrated Wind Farm Control Interacting with Digital Twins (ICONIC)

Coordinator
Universiteit Gent, Belgium
Runs
1 December 2023 to 30 November 2027
Status
Running
EU funding
€3.9m
Total cost
€3.9m
Partners
16 organisations in 7 countries
Type
Research and Innovation Action
Grant agreement
101122329

What the project is doing

In the project's own words, from its summary on CORDIS.

ICONIC aims to develop innovative physical and digital tools to achieve fundamental breakthroughs for the integrated control of wind farms, considering the whole physical system at farm, turbine, and component levels, in particular the complex aerodynamic interactions among turbines. ICONIC aims to increase farm-wide power production by 15-20% under optimal wind speeds and directions for typical wind farms suffering from wake effects, with a 3%-5% increase in annual energy production (AEP) considering all working conditions over the long term.

It targets an LCOE reduction of at least 6% compared with the state-of-the-art control tools deployed in the current wind industry by improving farm-wide AEP and reducing operation & maintenance costs via leveraging the latest AI and digital technologies. Extensive validations for the integrated wind farm control solutions will be conducted via high-fidelity simulation models, experiments at a national-level wind tunnel, historical operational data at BP’s and C-Power’s wind farms, a unique collection of test rigs for critical turbine components at respective companies, and real-world wind farm field tests at C-Power.

ICONIC’s integrated wind farm control system will contain (1) novel AI-based wind farm control system to unlock wind farms’ full potential; (2) novel data-enhanced wind turbine controllers to fulfil farm-level commands while balancing power generation and load mitigation; (3) an integration with digital twins (DTs) as extra support to improve control and reduce costs, which contains a first-ever farm-level DT for wind farm flow systems replicating detailed physical flow fields and an innovative turbine-level DT with critical component models for loading and lifetime estimations; (4) extensions of the solutions to future 20MW turbines.

ICONIC will establish new knowledge and industrial leadership in key digital, enabling and emerging technologies, and deliver next-generation tools for wind farm operation.

Topics

Who is involved

OrganisationCityCountryRole
Universiteit GentGentBelgiumCoordinator
C-Power NVOostendeBelgiumParticipant
Katholieke Universiteit LeuvenLeuvenBelgiumParticipant
Thornton Bank Maintenance ServicesOstendBelgiumThird party
Zf Wind Power Antwerpen NVLommelBelgiumParticipant
Embotech AGZurichSwitzerlandAssociatedpartner
Aalborg UniversitetAalborgDenmarkParticipant
Bearinn - R&d AieIdiazabalSpainThird party
Ikerlan S. CoopMondragonSpainParticipant
Lau Lagun Bearings SLOlaberriaSpainParticipant
Skf BVHoutenNetherlandsParticipant
Edr & Medeso ASSandvikaNorwayParticipant
Norges Teknisk-Naturvitenskapelige Universitet NTNUTrondheimNorwayParticipant
Bp International LimitedSunbury On ThamesUnited KingdomAssociatedpartner
Imperial College of Science Technology and MedicineLondonUnited KingdomAssociatedpartner
University of WarwickCoventryUnited KingdomAssociatedpartner

Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI