- Coordinator
- Supergrid Institute, France
- Runs
- 1 January 2023 to 30 April 2027
- Status
- Running
- EU funding
- €50.7m
- Total cost
- €70.0m
- Partners
- 33 organisations in 10 countries
- Type
- Innovation Action
- Grant agreement
- 101095874
What the project is doing
In the project's own words, from its summary on CORDIS.
To unlock multi-vendor HVDC grids and foster the transition of the European energy sector at large scale, InterOPERA proposes a coordinated approach between a diverse, high-level group of industries at the forefront of RES development and grid management. 4 HVDC vendors, 8 TSOs, 2 wind turbine vendors and 3 wind park developers bring their industrial knowledge and practical abilities to make future HVDC systems mutually compatible and interoperable by design, and to improve the grid forming capabilities of offshore and onshore converters.
Foreseen and planned HVDC projects will be analysed to define a demonstrator case study. The resulting system-level design will be usable as a guidance to coordinate offshore network planning. This new way of framing the European grid architecture and topology will ensure forward compatibility for future seamless system expansion. Interoperability of control and protection systems will be de-risked through the execution of all necessary activities concurring to the implementation of a real-time physical demonstrator.
Concrete results will be delivered through this practical work: detailed functional specifications for each subsystem, standardised models, simulation platforms and interaction study processes, multi-vendor cooperation agreements. Those frameworks will be generalised into operational and strategic tools available to all European stakeholders for the development of multi-terminal HVDC grids that will enhance offshore wind development and integration.
Solutions for multi-vendor project procurement, compliant with existing and future regulations, standards and laws, integrating the technical specifications and interoperability assessment tender stages, will be provided to pave the way to the first real-life projects in Europe. External stakeholders will be involved in two-way consultation workshops to maximise the uptake of InterOPERA’s key exploitable results. Recommendations to grid codes and standards will be issued.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Supergrid Institute | Villeurbanne | France | Coordinator |
| Association Europeenne De L'industrie Des Equipements Et Des Services De Transmission Et De Distribution D'electricite Aisbl | Bruxelles / Brussel | Belgium | Participant |
| Elia Grid International | Bruxelles / Brussel | Belgium | Third party |
| Elia Transmission Belgium | Bruxelles | Belgium | Third party |
| Windgrid | Bruxelles / Brussel | Belgium | Third party |
| WindEurope | Bruxelles / Brussel | Belgium | Participant |
| 50hertz Transmission GmbH | Berlin | Germany | Participant |
| Amprion GmbH | Dortmund | Germany | Participant |
| Elia Grid International GmbH | Berlin | Germany | Third party |
| Ge Grid GmbH | Berlin | Germany | Participant |
| Siemens Energy Global GmbH & Co. Kg | Munchen | Germany | Participant |
| Tennet Tso GmbH | Bayreuth | Germany | Participant |
| Energinet | Fredericia | Denmark | Participant |
| Energinet Eltransmission AS | Fredericia | Denmark | Third party |
| Energinet Systemansvar A/s | Fredericia | Denmark | Third party |
| Orsted Wind Power A/s | Fredericia | Denmark | Participant |
| Siemens Gamesa Renewable Energy AS | Brande | Denmark | Participant |
| Vattenfall Vindkraft A/s | Esbjerg | Denmark | Participant |
| Vestas Wind Systems A/s | Aarhus | Denmark | Participant |
| Rte Reseau De Transport D'electricite | Paris | France | Participant |
| Terna - Rete Elettrica Nazionale SpA | Roma | Italy | Participant |
| Terna Rete Italia SpA | Roma | Italy | Third party |
| Mitsubishi Electric Corporation | Tokyo | Japan | Associatedpartner |
| Rijksuniversiteit Groningen | Groningen | Netherlands | Participant |
| Technische Universiteit Delft | Delft | Netherlands | Participant |
| Tennet Tso BV | Arnhem | Netherlands | Participant |
| Equinor Asa | Stavanger | Norway | Third party |
| Equinor Energy AS | Stavanger | Norway | Third party |
| Equinor Wind Power AS | Stavanger | Norway | Participant |
| Statnett Sf | Oslo | Norway | Participant |
| Hitachi Energy Sweden AB | Vasteras | Sweden | Participant |
| Scibreak AB | Bolinderbyn | Sweden | Participant |
| UK Grid Solutions Limited | Stafford | United Kingdom | Associatedpartner |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI