Kore- SI Cost-competitive low-carbon silicon production for European industry
- Coordinator
- Kore Metals SARL, Luxembourg
- Runs
- 1 October 2026 to 30 September 2028
- Status
- Running
- EU funding
- €2.5m
- Total cost
- —
- Partners
- 1 organisations in 1 countries
- Type
- European Innovation Council
- Grant agreement
- 101331875
What the project is doing
In the project's own words, from its summary on CORDIS.
Silicon is a critical raw material for the European Union and an essential input for energy, digital and industrial manufacturing. Customers depend on stable supply, predictable costs and compliance with rising climate requirements. This project addresses these needs directly. The objective is to demonstrate a new electricity-driven route for producing metallurgical-grade silicon with lower direct carbon emissions than conventional production.
By removing fossil carbon from the core reduction step, the process reduces exposure to fuel price volatility and limits carbon-related cost risks. Modular production units replace very large furnaces, improving operational flexibility and supply reliability. With EIC support, we will optimise our current process for scale-up and design, build and operate a single cell pilot equivalent to a 1,000 tonne per year production unit.
The pilot will validate stable operation, product recovery and repeatability under industrial conditions. Each unit functions as a standard building block, allowing production to scale through replication rather than large, capital-intensive installations. For customers, this approach enables competitive silicon supply with lower emissions, improved cost predictability and reduced supply risk. It supports long term procurement planning while contributing to European objectives on industrial decarbonisation and security of supply for critical raw materials.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Kore Metals SARL | Mondercange | Luxembourg | Coordinator |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI