- Coordinator
- Sintef AS, Norway
- Runs
- 1 December 2023 to 31 May 2027
- Status
- Running
- EU funding
- €6.0m
- Total cost
- €6.0m
- Partners
- 13 organisations in 5 countries
- Type
- Research and Innovation Action
- Grant agreement
- 101136096
What the project is doing
In the project's own words, from its summary on CORDIS.
MADE4WIND aims to develop and test innovative components' concepts for a 15MW offshore Floating Wind Turbine (FWT) consisting of new designs and manufacturing techniques for blades, substructure, and drivetrain. The main results obtained in the project will be:- Novel FWT component design (and validation at reduced-scale): Lighter and recyclable WT blades; Improved TLP substructure (including lightweight floater concept, smaller gravity anchor and lighter tendons); and Improved drivetrain design (by a Compact generator with less rare-earths, and more reliable converter).- New material applications: new blade toughening material; new concrete; and Aluminum rebars for floating substructure.- New manufacturing processes: Preform for manufacturing blades.- Recyclability/Reuse of composites from Blades, concrete from substructure, and Aluminum rebars.- New software tools: Novel maintenance strategy and remote control systems; Improved modelling tool for LCoE analysis; Virtual model of 15MW FWT.- Guidelines: Integrated sustainability assessment; Biodiversity protection strategy; Training pathways for offshore wind local industry; Position paper with Offshore Wind stakeholders.
These innovations will jointly allow future FWT to include new circular lightweight materials, minimize the impact of sea habitats, increase operational availability, reduce maintenance needs and minimize LCoE; thus, unlocking the massive deployment of >15MW floating WFs in Europe and worldwide. Partners' expertise will be key for project success, as they cover different expertise along the offshore wind value chain: Academia (SINTEF, AAU, NTNU, IFEU), consultancy (ZABALA), material suppliers (Norsk Hydro, Fibertex), WT components manufacturers (Acciona, Ingeteam, Indar) and WT manufacturer (Siemens-Gamesa).
Moreover, in addition to partners' research skills, MADE4WIND proposes a strong dissemination plan, clustering with relevant Offshore Wind stakeholders, to maximise future impacts.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Sintef AS | Trondheim | Norway | Coordinator |
| Zabala Brussels | Bruxelles / Brussel | Belgium | Participant |
| Ifeu - Institut Fur Energie- Und Umweltforschung Heidelberg Ggmbh | Heidelberg | Germany | Participant |
| Aalborg Universitet | Aalborg | Denmark | Participant |
| Fibertex Nonwovens A/s | Aalborg | Denmark | Participant |
| Siemens Gamesa Renewable Energy AS | Brande | Denmark | Participant |
| Acciona Construccion Iberia SA | Madrid | Spain | Participant |
| Ingeteam Indar Machines SA | Gipuzkoa | Spain | Participant |
| Ingeteam Service SA | Albacete | Spain | Participant |
| RES Energy Global Services S.L.U. | Derio | Spain | Participant |
| Zabala Innovation Consulting SA | Mutilva Alta Navarra | Spain | Third party |
| Norges Teknisk-Naturvitenskapelige Universitet NTNU | Trondheim | Norway | Participant |
| Norsk Hydro Asa | Oslo | Norway | Participant |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI