NESS – New Electrified Supercharging System NESS Dual Hybrid Systems – Cost-effective CO2 solutions to increased Vehicle Electrification and Efficiency
- Coordinator
- Kasi Technologies AB, Sweden
- Runs
- 1 April 2022 to 31 March 2024
- Status
- Finished
- EU funding
- €2.0m
- Total cost
- €2.9m
- Partners
- 1 organisations in 1 countries
- Type
- European Innovation Council
- Grant agreement
- 190138361
What the project is doing
In the project's own words, from its summary on CORDIS.
NESS is the most efficient and cost-effective dual hybrid (electric- fuel) solution and reduces 13-18% vehicles fuel consumption, CO2- and NOx emissions. It also converts fossil-fuelled gasoline- and diesel cars into Hybrid Electric Vehicles (H-EVs) ready for 100% climate neutral renewable fuels, such as e-fuels, H2 gas and 2nd gen biofuels. NESS converts both new- and existing cars as a plug n play retrofit product conversion.
It consists of an add-on component that goes attached to the engines alternator and turbocharger, forming a fully modular solution adaptable to all types of engine- and vehicle sizes. The savings are attained thanks to various functionalities that reduce the consumption of the vehicle in different ways depending on the drive mode the vehicle runs; exhaust gas energy recovery works at cruising, regenerative breaking when breaking, energy boosting functions at accelerating and stop & start functions when the vehicle is stationary.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Kasi Technologies AB | Smedjebacken | Sweden | Coordinator |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI