QUASAR 70%plus eco-efficiency gains in the PV EOL supply chain by closed loop systems with enhanced recycling rates, systematic collection and management utilising digital twins
- Coordinator
- Sintef AS, Norway
- Runs
- 1 September 2023 to 30 November 2027
- Status
- Running
- EU funding
- €7.1m
- Total cost
- —
- Partners
- 24 organisations in 10 countries
- Type
- Innovation Action
- Grant agreement
- 101122298
What the project is doing
In the project's own words, from its summary on CORDIS.
QUASAR will develop and implement solutions for a systematic collection and management methodology and decision tools for EOL-PV-modules based on a holistic approach between all parts and actors across the EOL supply chain including concepts of reverse logistic technologies, AI/machine learning, product lifecycle information management (PLIM) based on digital twins, and best practices for sorting, warehouse operations, testing and repair/reuse.
EOL decision-making will be supported through the delivery of a digital product passport thanks to smart sensor tags as well as rapid, non-destructive testing methods for assessing EOL-PV condition for reuse/repair/recycling in the field and at waste treatment facilities. Repair technology solutions will be provided, along with guidelines for second-life warranty, quality thresholds, product reliability, labelling and tracking.
QUASAR will upscale and demonstrate two emerging recycling technologies based on delamination by controlled thermal and chemical treatment [pilot A] and waterjet delamination [pilot B], targeting EOL-PV recycling rates of 70-90% for silicon, metals, glass and polymers with high purity for reuse in the PV industry, as well as semi-conductor industry, speciality chemicals, float glass, or other products. Material closed-loop systems will be implemented to enable a circular economy for the PV industry.
By 2050, from the upscaling and worldwide deployment of both recycling technologies, substantial volumes of secondary raw materials will be unlocked: 220,000 tons of silicon, 5,200 tons of silver, 62,000 tons of copper and 4,700,000 tons of glass, accompanied with 421 million tons of CO2 savings. To achieve its specific objectives, QUASAR gathers a multidisciplinary consortium involving commercial actors from across the entire EOL supply chain: PV module manufacturers, utility scale PV system operators, collectors, recyclers, and end users of recycled secondary raw materials.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Sintef AS | Trondheim | Norway | Coordinator |
| Dow Silicones Belgium | Seneffe | Belgium | Associatedpartner |
| Bifa Umweltinstitut GmbH | Augsburg | Germany | Participant |
| Buhck Re.energy GmbH & Co. Kg | Hamburg | Germany | Participant |
| Hme Hamburger Mullentsorgung Rohstoffverwertungsgesellschaft Mbh | Hamburg | Germany | Participant |
| Hochschule Offenburg | Offenburg | Germany | Participant |
| Luxchemtech GmbH | Freiberg | Germany | Participant |
| Dow Chemical Iberica SL | Madrid | Spain | Associatedpartner |
| Institut Photovoltaique D'ile De France (ipvf) | Palaiseau | France | Participant |
| Rosi | Seyssins | France | Participant |
| Rosi Alpes | Saint-Honore | France | Third party |
| Soren | Paris | France | Participant |
| Epri Europe Dac | Dublin | Ireland | Participant |
| Soli Tek Cells | Vilniaus miesto | Lithuania | Participant |
| Elkem Asa | Oslo | Norway | Third party |
| Elkem Silicon Product Development AS | Kristiansand | Norway | Participant |
| Equinor Energy AS | Stavanger | Norway | Participant |
| Fornybar Utvikling AS | Oslo | Norway | Participant |
| Norner Research AS | Porsgrunn | Norway | Participant |
| Scatec Asa | Oslo | Norway | Participant |
| Solenergiklyngen | Oslo | Norway | Participant |
| Mylar Specialty Films UK Limited | Redcar | United Kingdom | Associatedpartner |
| Electric Power Research Institute Inc | Palo Alto | United States | Associatedpartner |
| Scatec Africa (pty) Ltd | Western Cape | South Africa | Third party |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI