- Coordinator
- Danmarks Tekniske Universitet, Denmark
- Runs
- 1 May 2026 to 30 April 2030
- Status
- Running
- EU funding
- €7.0m
- Total cost
- —
- Partners
- 9 organisations in 6 countries
- Type
- Innovation Action
- Grant agreement
- 101268821
What the project is doing
In the project's own words, from its summary on CORDIS.
SAMBA (Semi-Automated Manufacturing Blade Approach) delivers a transformative leap in wind turbine blade manufacturing by integrating semi-automation, digital quality assurance, and advanced materials into a scalable pilot line. As Europe targets 500 GW wind capacity by 2030, SAMBA addresses the urgent need for high-throughput, defect-free blade production. The project pioneers four innovation streams: (1) automated ply kitting and stacking to reduce ergonomic risks and improve layup precision; (2) intelligent pick-and-place systems for distortion-free mould placement; (3) digital assurance using AI-enabled defect detection and process modelling; and (4) advanced preforms with automated ply scarfing for improved drapability and joint integrity.
These innovations will be validated on a 40 m blade span of the V236 platform at Vestas’ Isle of Wight facility, demonstrating industrial relevance and readiness at TRL 6.SAMBA’s impacts span productivity, safety, sustainability, and competitiveness. It targets ≥50% cycle time reduction, ≥95% first-pass yield, and ≥5% unit cost savings, while reducing manual handling by ≥70% and aerosol exposure by ≥90%. Environmental benefits include ≥25% GHG reduction and ≥90% hardware reuse.
The project supports the EU Net Zero Industry Act by enabling clean-tech manufacturing in Europe and strengthening strategic autonomy. The consortium unites nine partners across six countries: two large enterprises (Vestas, Owens Corning), two SMEs (Envisma, Vivid Components), three RTOs (NCC, Tecnalia, Arditec), and two RPOs (DTU, University of Bristol). This interdisciplinary team spans manufacturing, robotics, materials science, AI, and sustainability, ensuring robust innovation and exploitation.
SAMBA will deliver 13 Key Exploitable Results, a full-scale demonstrator, and a roadmap for industrial deployment, positioning Europe at the forefront of sustainable wind energy manufacturing.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Danmarks Tekniske Universitet | Kongens Lyngby | Denmark | Coordinator |
| Envisma GmbH | Kehrsatz | Switzerland | Participant |
| Vivid Components Germany UG | Paderborn | Germany | Participant |
| Vestas Wind Systems A/s | Aarhus | Denmark | Participant |
| Fundacion Tecnalia Research & Innovation | Donostia/San Sebastian | Spain | Participant |
| Association Pour La Recherche Et Ledeveloppement D'innovations Et Detechnologies Pour La Protection Del'heritage Environnemental, Social | Nice | France | Participant |
| Ocv Chambery International | Chambery | France | Participant |
| Ncc Operations Limited | Bristol | United Kingdom | Participant |
| University of Bristol | Bristol | United Kingdom | Participant |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI