SCALE-AEM Supply Chain & Automated production Line Expansion for AEM electrolysers
- Coordinator
- Fraunhofer Gesellschaft Zur Forderung Der Angewandten Forschung eV, Germany
- Runs
- 1 January 2026 to 31 December 2028
- Status
- Running
- EU funding
- €4.0m
- Total cost
- —
- Partners
- 7 organisations in 5 countries
- Type
- Research and Innovation Action
- Grant agreement
- 101251223
What the project is doing
In the project's own words, from its summary on CORDIS.
Anion exchange membrane electrolysis (AEMEL) is the most promising technology for affordable, clean hydrogen production in Europe. It avoids use of costly or harmful materials and benefits from dynamic pricing of renewable energy. However, production scale-up is currently hampered by short technical lifespan and lack of manufacturing standardisation and automation. SCALE-AEM aims to resolve these bottlenecks and will: 1.
Increase production rates, while reducing production costs by scaling up and automating production processes throughout the supply chain, from raw materials to stack production, while reducing waste and rejection of parts or stacks due to anomalies2. Enhance performance and operational lifetime, by developing a next generation AEMEL stack, with improved membrane and catalyst lifetime3. Improve life cycle of the stack and its components with more circularity and sustainability, through integrated life cycle management in development, design, and (dis)assemblySCALE-AEM unites the entire manufacturing supply and production chain for AEMEL electrolysers.
It includes 4 innovation-driven SME’s’; ANTA (flow plate/bipolar plate), HYD (membrane), MAT (cathode/anode electrodes) and V2H (system integration and performance optimisation), and large company COMAU (automation and process engineering), guided by leading European institute FRA. Dissemination and exploitation is supported by innovation SME CORE. SCALE-AEM will validate a production line capable of producing up to 100kW AEMEL stacks at €300 (kg/d) level, translating into clean hydrogen produced at less than ~3.00 €(kg/d), below the costs of Steam Methane Reforming for grey hydrogen.
The long-term ambition of the consortium is to obtain investments for a 1GW production line per year, operational by 2030, fulfilling 10% of EU’s need by 2035. By replacing fossil hydrogen to continue AEMEL technology developments, and driving further cost reductions, the EU can be a global leader in electrolyser production.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Fraunhofer Gesellschaft Zur Forderung Der Angewandten Forschung eV | Munchen | Germany | Coordinator |
| Core Innovation and Technology Oe | Chalkis | Greece | Participant |
| Matteco Team SL | Valencia | Spain | Participant |
| Hydrolite Ltd | Netanya | Israel | Participant |
| Antares Electrolysis S.r.l. | Genova | Italy | Participant |
| Comau SpA | Grugliasco To | Italy | Participant |
| Vision2h S.p.a. | Grugliasco | Italy | Participant |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI