SCARLET Superconducting cables for sustainable energy transition
- Coordinator
- Sintef Energi AS, Norway
- Runs
- 1 September 2022 to 28 February 2027
- Status
- Running
- EU funding
- €15.0m
- Total cost
- €19.6m
- Partners
- 15 organisations in 7 countries
- Type
- Innovation Action
- Grant agreement
- 101075602
What the project is doing
In the project's own words, from its summary on CORDIS.
Superconducting medium-voltage cables, based on HTS and MgB2 materials, have the potential to become the preferred solution for energy transmission from many renewable energy sites to the electricity grid. Onshore HTS cables provide a compact design, which preserves the environment in protected areas and minimizes land use in urban areas where space is limited. Offshore HTS cables compete on cost and – compared to conventional HVDC cables – have the clear benefit of eliminating the need for large and costly converter stations on the offshore platforms.
MgB2 cables in combination with safe liquid hydrogen transport directly from renewable energy generation sites to e.g., ports and heavy industries, introduce a new paradigm of two energy vectors used simultaneously in the future. Both HTS, cooled with liquid nitrogen, and MgB2, cooled with liquid hydrogen, MVDC superconducting cables will be designed, manufactured, and tested, including a six-month test for the MgB2 cable.
For grid protection, a high-current superconducting fault current limiter module will be designed and tested. Furthermore, the technology developments will be supported by techno-economic analyses, and a study of elpipes, large cross-section conductors for high-power transfer, will be performed. The superconductor technology developments will accelerate the energy transition towards a low-carbon society by the direct key impacts of the project:•30% LCOE reduction for offshore windfarm export cables•15% reduction in total cost of entire offshore windfarms•Possibility to transfer 0.5 GW in the form of H2 and 1 GW electric energy in one combined system•Installation of cables for 90 GW transmission capacity by the consortium partners by 2050•Creation of 5 000 European jobs within the field of sustainable energy
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Sintef Energi AS | Trondheim | Norway | Coordinator |
| Gfz Helmholtz-Zentrum Fur Geoforschung | Potsdam | Germany | Participant |
| Nexans Deutschland GmbH | Hannover | Germany | Participant |
| Vision Electric Super Conductors GmbH | Kaiserslautern | Germany | Participant |
| Absolut System SAS | Eybens | France | Participant |
| Ecole Superieure De Physique Et Dechimie Industrielles De La Ville Deparis | Paris | France | Participant |
| Nexans France | Puteaux | France | Participant |
| Supergrid Institute | Villeurbanne | France | Participant |
| Supernode Limited | Dublin | Ireland | Participant |
| Alma Mater Studiorum - Universita Di Bologna | Bologna | Italy | Participant |
| Asg Superconductors SpA | Genova | Italy | Participant |
| Ricerca Sul Sistema Energetico - Rse SpA | Milano | Italy | Participant |
| Rina Consulting SpA | Genova | Italy | Participant |
| Wavec/offshore Renewables - Centro De Energia Offshore | Lisboa | Portugal | Participant |
| Institute of Electrical Engineering, Slovak Academy of Sciences | Bratislava | Slovakia | Participant |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI