Atlas / Norway

Innovation Action · Running

SCARLET Superconducting cables for sustainable energy transition

Coordinator
Sintef Energi AS, Norway
Runs
1 September 2022 to 28 February 2027
Status
Running
EU funding
€15.0m
Total cost
€19.6m
Partners
15 organisations in 7 countries
Type
Innovation Action
Grant agreement
101075602

What the project is doing

In the project's own words, from its summary on CORDIS.

Superconducting medium-voltage cables, based on HTS and MgB2 materials, have the potential to become the preferred solution for energy transmission from many renewable energy sites to the electricity grid. Onshore HTS cables provide a compact design, which preserves the environment in protected areas and minimizes land use in urban areas where space is limited. Offshore HTS cables compete on cost and – compared to conventional HVDC cables – have the clear benefit of eliminating the need for large and costly converter stations on the offshore platforms.

MgB2 cables in combination with safe liquid hydrogen transport directly from renewable energy generation sites to e.g., ports and heavy industries, introduce a new paradigm of two energy vectors used simultaneously in the future. Both HTS, cooled with liquid nitrogen, and MgB2, cooled with liquid hydrogen, MVDC superconducting cables will be designed, manufactured, and tested, including a six-month test for the MgB2 cable.

For grid protection, a high-current superconducting fault current limiter module will be designed and tested. Furthermore, the technology developments will be supported by techno-economic analyses, and a study of elpipes, large cross-section conductors for high-power transfer, will be performed. The superconductor technology developments will accelerate the energy transition towards a low-carbon society by the direct key impacts of the project:•30% LCOE reduction for offshore windfarm export cables•15% reduction in total cost of entire offshore windfarms•Possibility to transfer 0.5 GW in the form of H2 and 1 GW electric energy in one combined system•Installation of cables for 90 GW transmission capacity by the consortium partners by 2050•Creation of 5 000 European jobs within the field of sustainable energy

Topics

Who is involved

OrganisationCityCountryRole
Sintef Energi ASTrondheimNorwayCoordinator
Gfz Helmholtz-Zentrum Fur GeoforschungPotsdamGermanyParticipant
Nexans Deutschland GmbHHannoverGermanyParticipant
Vision Electric Super Conductors GmbHKaiserslauternGermanyParticipant
Absolut System SASEybensFranceParticipant
Ecole Superieure De Physique Et Dechimie Industrielles De La Ville DeparisParisFranceParticipant
Nexans FrancePuteauxFranceParticipant
Supergrid InstituteVilleurbanneFranceParticipant
Supernode LimitedDublinIrelandParticipant
Alma Mater Studiorum - Universita Di BolognaBolognaItalyParticipant
Asg Superconductors SpAGenovaItalyParticipant
Ricerca Sul Sistema Energetico - Rse SpAMilanoItalyParticipant
Rina Consulting SpAGenovaItalyParticipant
Wavec/offshore Renewables - Centro De Energia OffshoreLisboaPortugalParticipant
Institute of Electrical Engineering, Slovak Academy of SciencesBratislavaSlovakiaParticipant