- Coordinator
- Subra A/s, Denmark
- Runs
- 1 September 2023 to 31 August 2025
- Status
- Running
- EU funding
- €2.5m
- Total cost
- €3.6m
- Partners
- 1 organisations in 1 countries
- Type
- European Innovation Council
- Grant agreement
- 190185467
What the project is doing
In the project's own words, from its summary on CORDIS.
Power transmission is a critical step in electrifying and decarbonizing Europe. The construction of cross-continental grids for transmitting large amounts of power over very long distances has become strategic. But using current cables made with standard conductors entail prohibitive energy losses in such grids: 50GW would be wasted in a pan-European 75.000km 10GW High-Voltage Direct-Current (HVDC) grid, equal to the electricity produced by 50 power plants.
SUBRA, a spin-off from the Technical University of Denmark (DTU), has developed and patented a solution which will revolutionise European grids by mass producing High Temperature Superconductor (HTS) power cables, with superior properties, no limitation in length, and at an affordable price. This represents a ground-breaking option allowing: 90% reduction of energy losses; 99% reduction of copper required; 75% reduction of Levelized Cost of Transmission (LCoT); and using small underground lines rather than overhead lines.
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Subra A/s | Farum | Denmark | Coordinator |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI