Super-HEART Super-HEART: a fault-tolerant and highly efficient energy hub with embedded short-term energy storage for high availability electric power delivery
- Coordinator
- Christian-Albrechts-Universitaet Zu Kiel, Germany
- Runs
- 1 April 2022 to 31 March 2025
- Status
- Running
- EU funding
- €2.5m
- Total cost
- €2.5m
- Partners
- 3 organisations in 2 countries
- Type
- European Innovation Council
- Grant agreement
- 101057679
What the project is doing
In the project's own words, from its summary on CORDIS.
Power electronics (PE) is spreading through society, including in mission critical applications. However, PE devices are prone to failure, and high availability is usually ensured using redundancy - which is expensive and bulky. In the meantime, PE allows hybrid (AC & DC) electric distribution, which is key to integration of solar power and use of hydrogen as energy carrier. But loads can be affected by the limited dynamics of power sources like fuel cells and by disturbances carried by the network.
With Super-HEART, we want to build an energy hub connecting power sources and load, and able to deliver uninterrupted power. To this end, we will develop a multi-port modular converter with fault ride-through capability. This will be ensured using fault-tolerance strategies already proved in the ERC PoC Project ""U-HEART"", improved by the integration of supercapacitors (SC) to allow using reliable and low-cost mechanical switches to isolate the faulty parts instead of semiconductor switches, leading to a significantly higher TRL.
Super-HEART will use SC also for compensating disturbances and the low dynamics of hydrogen-based storage. But commercial SC have power and energy densities too low to be practically considered here. Therefore, previously developed high-performance and environment friendly SC will be further optimised in this project and embedded in the converter by optimal co-design. In parallel to the technological development, we will prepare the monetisation of the IP, comprising a market analysis, the development of solid business model and tech-to-market transition plan, and the search for clients and partners.
Ultimately, a power converter with embedded SC with availability, power density, cost, and losses, 20% better than state-of-the-art will have been developed, with reduced environmental impact. It will be ready for qualification and have undergone field tests. Potential clients and partners for the development and distribution will have been found.""
Topics
Who is involved
| Organisation | City | Country | Role |
|---|---|---|---|
| Christian-Albrechts-Universitaet Zu Kiel | Kiel | Germany | Coordinator |
| Fraunhofer Gesellschaft Zur Forderung Der Angewandten Forschung eV | Munchen | Germany | Third party |
| The Provost, Fellows, Foundation Scholars & the Other Members of Board, of the College of the Holy & Undivided Trinity of Queen Elizabeth Near Dublin | Dublin | Ireland | Participant |
Source: CORDIS, European Commission. Data of 5 Nov 2026, reused under the Commission's reuse policy. View on CORDIS · Grant DOI